欧美日韩国产剧情,欧美日韩乱国产,亚洲欧美日韩精品专区,欧美日韩免费看,成在线人免费视频一区二区三区,一区二区三区在线视频播放,精品国产1区

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


汉中市| 淮滨县| 龙门县| 酒泉市| 湘乡市| 凤翔县| 太仆寺旗| 东莞市| 远安县| 阳新县| 濮阳市| 平阳县| 江安县| 巴彦县| 庄浪县| 卢湾区| 裕民县| 中牟县| 广饶县| 灵璧县| 营山县| 六枝特区| 鄂托克旗| 和硕县| 孝昌县| 潢川县| 霍山县| 洛浦县| 饶阳县| 孝感市| 旅游| 奇台县| 布拖县| 柏乡县| 峨山| 招远市| 潞西市| 罗城| 富平县| 静宁县| 榕江县|