欧美日韩国产剧情,欧美日韩乱国产,亚洲欧美日韩精品专区,欧美日韩免费看,成在线人免费视频一区二区三区,一区二区三区在线视频播放,精品国产1区

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


蓬溪县| 南安市| 扶沟县| 通道| 鸡泽县| 汝城县| 根河市| 万年县| 澜沧| 广州市| 馆陶县| 宜都市| 文昌市| 砀山县| 灌云县| 河西区| 明溪县| 兴安县| 杨浦区| 泾阳县| 班玛县| 永泰县| 天峨县| 芜湖市| 美姑县| 泾川县| 夏津县| 建瓯市| 高要市| 镇巴县| 阿拉善左旗| 漳浦县| 临夏市| 修武县| 图片| 山东| 台北市| 平远县| 平江县| 江口县| 秦安县|