欧美日韩国产剧情,欧美日韩乱国产,亚洲欧美日韩精品专区,欧美日韩免费看,成在线人免费视频一区二区三区,一区二区三区在线视频播放,精品国产1区

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


尉犁县| 河北省| 昌黎县| 彰化县| 和静县| 南城县| 镇原县| 海城市| 玉屏| 贡觉县| 红安县| 简阳市| 云梦县| 曲阳县| 莲花县| 宿松县| 佛山市| 布尔津县| 桃江县| 郧西县| 买车| 资源县| 叙永县| 庆城县| 大邑县| 江川县| 德钦县| 吉木乃县| 阳新县| 栾城县| 三明市| 凤庆县| 天长市| 南和县| 五大连池市| 时尚| 无为县| 平山县| 岫岩| 靖江市| 乌拉特前旗|